Building Information Before Building – Architecture Review Process
Before
breaking ground at Yachtsman's Point Subdivision please read the
Association documents detailing requirements
during pre- and post-construction. Guidelines and forms are available upon
request to the YPHOA and are
contained in the PDF file on the website. Click on the link below. Failure to comply with the
requirements and Architecture Review
Committee (ARC) process could result in
loss of your road bond deposit. Feel free to
contact the YPHOA, Attn: ARC (via email/mail) with any questions or
comments. Architectural Guidelines Document - April 2007
Step 1: Request construction approval Submit the following to the YPHOA; Attn: ARC: a) A set of house plans (blue-prints) and CD ROM (if available) b) An overhead site plan detailing the location of the home and the location of items such as driveway, septic area, any outbuilding, landscaping, lighting, tree removal, etc. c) A completed Preliminary Design Checklist (Form 1) d) A check for $700 payable to YPHOA for the surety deposit/road bond, of which up to $600 is refundable upon meeting all ARC requirements. e) A second check for $250 (non-refundable) payable to YPHOA for the review and document approval process.
The YPHOA will notify you via email/mail of ARC
construction approval. Step 2: Prior to any construction Once the ARC notifies you that your documents are in compliance, schedule a meeting between the property owner, the building contractor, and members of the ARC on-site before any construction begins. Construction approval will not be granted prior to this meeting.
With YPHOA
construction approval, an orange silt fence MUST be properly placed along the
shoulder of the road by the builder before ANY construction
begins on the property. Lakefront lots shall
also place a silt fence along the lakeshore setback before construction
begins. Step 3: Upon construction completion Please notify the YPHOA, when construction is complete. The ARC will view the completed construction and verify that all covenant requirements (pre- during and post construction) have been met. Upon ARC notification to the Board that final construction is fully compliant, the Board will refund to you up to $600 of the surety deposit/road bond.